Wall type aluminum alloy cantilever crane

24 Nov 2020 Products > Intelligent Crane

The wall type aluminum alloy cantilever crane is to install the aluminum alloy crane jib on the user's wall or house column, which can make full use of the space structure of the workshop, save the production site, operate flexibly, and can be used with the workshop or warehouse. Wall type aluminum alloy jib crane (also known as: wall column aluminum alloy cantilever crane, wall column aluminum alloy cantilever crane, wall column aluminum alloy rotary arm crane, aluminum alloy wall crane, wall aluminum alloy cantilever crane), special lifting equipment designed according to the needs of users. It has the advantages of novel structure, reasonable, simple, convenient operation, flexible rotation, light weight, flexible load movement and so on. It is an energy-saving and efficient material lifting equipment. Aluminum alloy cantilever crane can be widely used for lifting heavy objects in production line, assembly line and machine tool in factories, mines, workshops, warehouses and wharves.

Wall type aluminum alloy cantilever crane

The wall type aluminum alloy cantilever crane (aluminum alloy wall crane) is composed of bracket, rotating arm device and chain electric hoist. The cantilever is fixed on the wall or cement column and can be rotated according to the user's requirements. The rotary part is divided into manual rotation and electric rotation. The electric chain hoist is installed on the cantilever rail for lifting heavy objects.

Installation instructions for wall type aluminum alloy cantilever crane

1. Holes shall be drilled on the user's wall or steel structure column according to the corresponding position in the drawing.

2. Hoist the main cantilever by crane, fix the cantilever with upper and lower supporting plates with fixing bolts, measure the upper deflection with level gauge, and then tighten the nut on the rotating shaft clockwise.

3. Electric hoist, traveling trolley and slewing device are installed on the cantilever beam track.

4. All electrical appliances on the cantilever shall be connected and installed with proper length of power line.

Email Us